Plan of action for when I get on board:
Remove any rubbish and pump out bilge in front cabin so I can get the cabin liveable, remove scrap from engine (going to be a tough one) then cut through bulk head connecting the front cabin to the engine room, refit steps to engine room, lay temporary flooring in engine room, fit 240v to 24v inverter (to get the cabin lights on),fit temporary sink and connect waste.
Going to be a busy few days......
No comments:
Post a Comment