Today had been a bit of a rounding up lose ends day.
The last 2 sections of flooring have been completed, the bilges have been pumped out and the counter top above the water tank has been removed ready to grind the inlet pipe off ready for the plumbing. I also relocated the main consumer box and 24v transformer down into the engine room so the wheel house is a bit less cluttered. Tomorrows plans are to get the plumbing materials, seal the roof hatch and screw the remaining flooring down, then crack on with running the copper pipes.
No comments:
Post a Comment